Dutton Civils - Civil Engineers based in Ashbourne, Derbyshire
  • Home
  • What We Do
    • Duttons Civils
    • Duttons Construction
  • About us
  • Case Studies
    • Park Cakes
    • Greencore Factory Extension
    • Greencore Transport Yard
    • Greencore Transport Yard 2
    • Il Fornaio
    • Knoll Lodge
    • Nigel Fredericks - Phase 1
    • Nigel Fredericks - Phase 2
    • Billinsgate
  • Contact Us
  • Home
  • What We Do
    • Duttons Civils
    • Duttons Construction
  • About us
  • Case Studies
    • Park Cakes
    • Greencore Factory Extension
    • Greencore Transport Yard
    • Greencore Transport Yard 2
    • Il Fornaio
    • Knoll Lodge
    • Nigel Fredericks - Phase 1
    • Nigel Fredericks - Phase 2
    • Billinsgate
  • Contact Us
Search by typing & pressing enter

YOUR CART

Park Cakes

Dutton Civils was contracted to install a re-enforced concrete ring beam, foundation pads, sub-floor and floor slab for a new refrigerated storage unit at the Park Cake Bakeries Site, Oldham.
The ring beam and foundation pads were shuttered and tied into the existing yard slab to remove the need for any excavation.
Both the sub-floor and freezer floor slab were laid using a Ligchine laser screed and given a power float finish with a curing agent applied.

Built from the ground up!