Il Fornaio
George Dutton Trading Ltd was contracted to carry out the reduce level dig and installation of pad foundations and integral re-enforced concrete ring beam, sub-floor and floor slab for a new refrigerated storage unit for Il Fornaio at Park Royal, London.
Both the sub-floor and freezer floor slab were laid using a concrete pump, levelled by hand and given a power float finish with a curing agent applied.
Both the sub-floor and freezer floor slab were laid using a concrete pump, levelled by hand and given a power float finish with a curing agent applied.
|
|